Aufgabenträger · Hessen
Nordhessischer VerkehrsVerbund
- Abbreviation
- NVV
- Land / remit
- Hessen
- Legal form
- Zweckverband (public-law special-purpose association)
- Seat
- Kassel
Kurt-Schumacher-Straße 10, 34117 Kassel
- Website
- www.nvv.de
- Management
- Marian Volmer, Geschäftsführer (as of 6 July 2026)
Background
Nordhessischer Verkehrsverbund — the North-Hesse counterpart to RMV. Established 1995 as a public-law Zweckverband of the North-Hesse districts and the City of Kassel. Aufgabenträger for SPNV in northern Hessen; shares tender design principles with RMV and has developed its own fleet-financing model for the RegioTram and related networks.
Remit and mandate
SPNV-Aufgabenträger for northern Hesse (Regierungsbezirk Kassel).
Tender pipeline — Wettbewerbsfahrplan 2025
The following lots are listed in the 2025 Wettbewerbsfahrplan (BSN) with this authority as the lead or as a participating authority. Leadership counts: 3 lot(s) as lead authority, 10 lot(s) as participating authority.
As lead authority
No. 92
11NOH (NOH-Netz)
Gross · Other / TBD
- Contract term
- 01.12.2031 — 09.12.2046
- Services
- RB + RE · Electric · 4,93 M train-km/yr
- Rolling stock
- Pool: no · New-build: TBD · ETCS: retrofit
- Operator
- Not yet awarded / see authority
- Lines
- RB 5 Fulda – Bad Hersfeld – Bebra – Melsungen – Kassel-Wilhelmshöhe – Kassel Hbf RE 6 (Eisenach –) Bebra – Melsungen – Kassel-Wilhelmshöhe – Kassel Hbf RB 6 Eisenach – Bebra RB 83 Göttingen – Eichenberg – Hann Münden – Kassel Hbf RB 87 Göttingen – Eichenberg – Eschwege – Bebra
- Remarks
- Derzeit Prüfung auf notwendige Verschiebung des Betriebsstarts and / oder gestaffelte Betriebsaufnahme wegen Generalsanierungen and ETCS
No. 109
12NWH (NWH-Netz)
Gross · Other / TBD
- Contract term
- 01.12.2032 — 15.12.2047
- Services
- RB · TBD · 3,00 M train-km/yr
- Rolling stock
- Pool: no · New-build: yes · ETCS: pre-equipped
- Operator
- Not yet awarded / see authority
- Lines
- RB 4 Korbach – Bad Arolsen – Wolfhagen – Kassel-Wilhelmshöhe RB 39 Bad Wildungen – Wabern – Kassel-Wilhelmshöhe – Kassel Hbf RB 94 Erndtebrück – Bad Laasphe – Biedenkopf – Marburg RB 97 Brilon – Korbach – Frankenberg – Marburg
- Remarks
- potentially teilweise geänderter Zuschnitt des Netzes je nach Tractionsart in Prüfung (wg. Nachladen an Oberleitung)
No. 136
10RT (RegioTram-Netz)
Gross · Other / TBD
- Contract term
- 12.12.2033 — TBD
- Services
- other · Diesel + Electric · 2,37 M train-km/yr
- Rolling stock
- Pool: yes · New-build: no · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- RT 1 Hofgeismar-Hümme – Kassel Hbf – Kassel, Holländische Str. RT 4 Wolfhagen – Zierenberg – Kassel Hbf – Kassel, Holländische Str. RT 5 Melsungen Süd – Kassel-Wilhelmshöhe – Kassel Hbf – Kassel, Auestadion
- Remarks
- RegioTram service in both EBO and BOStrab territory
As participating authority
No. 168
Südniedersachsen
— · Other / TBD
- Contract term
- 01.12.2037 — TBD
- Services
- RB · Battery · — M train-km/yr
- Rolling stock
- Pool: yes · New-build: yes · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RB 79 Bodenburg - Hildesheim RB 80 Göttingen – Northeim – Nordhausen RB 81 Bodenfelde – Northeim – Nordhausen RE 10 Hannover – Goslar – Bad Harzburg RB 84 Paderborn – Ottbergen – Kreiensen RB 85 Paderborn – Ottbergen – Göttingen RB 86 Einbeck – Göttingen
No. 57
Leine-Weser
Gross · Other / TBD
- Contract term
- 09.12.2029 — 13.12.2037
- Services
- RB + RE · Battery · — M train-km/yr
- Rolling stock
- Pool: yes · New-build: yes · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RE 10 Hannover – Goslar – Bad Harzburg RB 82 Göttingen – Kreiensen – Bad Harzburg RB 79 Bodenburg – Hildesheim RB 84 Paderborn – Ottbergen – Kreiensen RB 85 Paderborn – Ottbergen – Göttingen RB 86 Einbeck-Mitte – Einbeck-Salzderhelden – Göttingen
- Remarks
- Vehicles provided by the authority
No. 180
Kinzigtal
Gross · Other / TBD
- Contract term
- 09.12.2040 — TBD
- Services
- RB + RE · Electric · 3,28 M train-km/yr
- Rolling stock
- Pool: TBD · New-build: TBD · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- HE 5 Frankfurt – Fulda RE 50 Frankfurt – Bebra RB 51 Frankfurt – Wächtersbach (– Bad Soden-Salmünster)
No. 38
Sauerlandnetz
Gross · Negotiated procedure with prior call for competition
- Contract term
- 10.12.2028 — TBD
- Services
- RB + RE · other · 5,80 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- RE 17 Hagen – Warburg – Kassel RE 57 Dortmand – Winterberg / Brilon Stadt RB 54 Unna – Neuenrade RB 53 Dortmand – Iserlohn RB 52 Dortmand – Lüdenscheid
- Remarks
- Traction: diesel + battery; Lot 1 (RB 52 + RB 53) already ends December 2034.
No. 128
Rhein-Ruhr-Express
TBD · Other / TBD
- Contract term
- 11.12.2033 — TBD
- Services
- RE · Electric · 14,69 M train-km/yr
- Rolling stock
- Pool: yes · New-build: no · ETCS: pre-equipped
- Operator
- Not yet awarded / see authority
- Lines
- RE 1 (RRX) Hamm – Aachen RE 4 Aachen – Dortmand RE 5 (RRX) Koblenz – Wesel RE 6 (RRX) Minden – Köln/Bonn Flughafen RE 11 (RRX) Düsseldorf – Kassel-Wilhelmshöhe
- Remarks
- NRW RRX model
No. 173
Mittelhessen
Gross · Other / TBD
- Contract term
- 12.12.2038 — TBD
- Services
- RB · Electric · 4,27 M train-km/yr
- Rolling stock
- Pool: TBD · New-build: TBD · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RB 37 (Kirchhain –) Gießen – Frankfurt RB 40 Dillenburg – Gießen – Frankfurt RB 41 Schwalmstadt-Treysa – Gießen – Frankfurt RB 49 (Gießen -) Friedberg – Hanau
No. 176
Main-Weser
Gross · Other / TBD
- Contract term
- 12.12.2038 — TBD
- Services
- RE · Electric · 1,22 M train-km/yr
- Rolling stock
- Pool: TBD · New-build: TBD · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RE 30 Kassel – Frankfurt
No. 177
Main-Lahn-Sieg
Gross · Other / TBD
- Contract term
- 12.12.2038 — TBD
- Services
- RE · Electric · 2,35 M train-km/yr
- Rolling stock
- Pool: TBD · New-build: TBD · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RE 98 Kassel – Frankfurt RE 99 Siegen – Frankfurt
No. 68
Thüringer Elektro Netz
Gross · Open procedure
- Contract term
- 15.12.2030 — 12.12.2043
- Services
- RB + RE · Electric + Battery · 5,80 M train-km/yr
- Rolling stock
- Pool: no · New-build: yes · ETCS: retrofit
- Operator
- Not yet awarded / see authority
- Lines
- Göttingen – Gera Erfurt – Glauchau (– Chemnitz) Erfurt – Altenburg Erfurt – Eisenach Eisenach – Naumburg Weimar – Jena-Göschwitz
No. 73
Saale-Thüringen-Südharz 2030+
Gross · Open procedure
- Contract term
- 15.12.2030 — 09.12.2045
- Services
- RB + RE · Electric · 8,30 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: retrofit
- Operator
- Not yet awarded / see authority
- Lines
- 1. service phase (bis 12/2032) Halle - Sangerhausen - Nordhausen - Kassel-Wilhelmshöhe Saalfeld - Jena - Naumburg - Leipzig Erfurt - Naumburg - Halle Saalfeld - Jena - Naumburg - Halle (Heiligenstadt-) Leinefelde - Nordhausen Erfurt - Sömmerda - Sangerhausen 2. service phase (ab 12/2032) Halle - Sangerhausen - Nordhausen - Kassel-Wilhelmshöhe Saalfeld - Jena - Naumburg - Leipzig Erfurt - Naumburg - Halle Saalfeld - Jena - Naumburg - Halle (Heiligenstadt-) Leinefelde - Nordhausen
- Remarks
- Service volume reduced from 12/2032 auf 7,8 Mio. train-km (service phase 2)
Source: Bundesverband SchienenNahverkehr (BSN), Wettbewerbsfahrplan 2025. Data are as published in the Wettbewerbsfahrplan and have not been independently verified against the underlying tender documentation.
Recent tender activity (TED, 2026)
Recent notices in the Supplement to the Official Journal (TED) with this authority as a lead or participating authority. This complements the Wettbewerbsfahrplan 2025 pipeline above; for the cross-cutting read see the development note SPNV procurement wave, mid-2026.
TED 615337-2026
Nordwesthessen-Netz — battery railcar trial
Result · Contract modification (sec. 132(2) GWB)
- Contract term
- Limited trial within the running 12NWH18 contract; modification concluded 29.07.2026
- Services
- SPNV · trial operation in place of diesel vehicles
- Rolling stock
- Three battery railcars leased by the operator; deployed to prepare the network’s decarbonisation and establish the infrastructure upgrade required
- Key date
- Awarded to DB RegioNetz Verkehrs GmbH; a change of operator was ruled out on technical grounds (integration into existing diagrams, short-notice swaps)
- Lines
- Nordwesthessen-Netz (Hesse and North Rhine-Westphalia)
- Remarks
- Value withheld. The network’s re-award (12NWH) follows in December 2032, with the perimeter expressly dependent on the traction type
TED 614061-2026
Thüringer Elektro-Netz (TEN)
Result · Closed without an award
- Contract term
- Would have run December 2030 — December 2043
- Services
- SPNV · Electric · ~7,4 M timetable-km/yr
- Rolling stock
- The notice is silent; the Wettbewerbsfahrplan records new-build required, no pool — on that basis the operator would have financed an entire electric fleet for thirteen years without residual-value or redeployment undertakings
- Key date
- Closed with nil tenders; reason given: decision of the buyer on account of changed requirements
- Lines
- RE 1 Göttingen – Gera; RE 2 Erfurt – Glauchau (– Chemnitz); RE 3 Erfurt – Altenburg; RB 11 Eisenach – Erfurt; RB 20 Eisenach – Naumburg; RB 21 Weimar – Jena-Göschwitz
- Remarks
- RB 21 is being carried forward separately as a three-year interim (TED 613650-2026)
Source: TED notices as cited (publication numbers). Facts are as published in the notices and have not been independently verified against the full tender documentation.