Aufgabenträger · Niedersachsen
Regionalverband Großraum Braunschweig
- Abbreviation
- RGB
- Land / remit
- Niedersachsen
- Legal form
- Regional association (public law)
- Seat
- Braunschweig
Hauptmarkt 30, 95028 Hof
- Website
- www.regionalverband-braunschweig.de
- Management
- Managing director(s) per the authority's Impressum. Names rotate; always check the current Impressum for the authoritative list.
Background
Regionalisierungsgesellschaft Bayern — a Bavarian sub-structure that participates in and coordinates specific tenders (in particular cross-border / Franken and Oberfranken nets) alongside BEG's Land-wide remit.
Remit and mandate
SPNV-Aufgabenträger for the Braunschweig region.
Tender pipeline — Wettbewerbsfahrplan 2025
The following lots are listed in the 2025 Wettbewerbsfahrplan (BSN) with this authority as the lead or as a participating authority. Leadership counts: 1 lot(s) as lead authority, 5 lot(s) as participating authority.
As lead authority
No. 55
Harz - Heide
Gross with incentive · Other / TBD
- Contract term
- 09.12.2029 — 12.12.2042
- Services
- RB · Battery · 3,10 M train-km/yr
- Rolling stock
- Pool: yes · New-build: yes · ETCS: retrofit
- Operator
- Not yet awarded / see authority
- Lines
- RB 47 Braunschweig – Gifhorn – Uelzen RB 42/43 Braunschweig – Vienenburg – Goslar / Bad Harzburg RB 45 Braunschweig – Schöppenstedt RB 44 Braunschweig – Salzgitter-Lebenstedt RB 48 Braunschweig – Salzgitter-Bad – Goslar (ab 12/2037) RB 46 Braunschweig – Herzberg (ab 12/2037)
As participating authority
No. 56
Südharz
Gross · Other / TBD
- Contract term
- 09.12.2029 — 13.12.2037
- Services
- RB · Diesel · — M train-km/yr
- Rolling stock
- Pool: yes · New-build: no · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RB 80 Göttingen – Northeim – Herzberg – Nordhausen RB 46 Braunschweig – Seesen – Herzberg RB 81 Bodenfelde – Northeim – Herzberg – Nordhausen
- Remarks
- Diesel transitional network; RB46 moves to the Harz-Heide network from 12/2037.
No. 57
Leine-Weser
Gross · Other / TBD
- Contract term
- 09.12.2029 — 13.12.2037
- Services
- RB + RE · Battery · — M train-km/yr
- Rolling stock
- Pool: yes · New-build: yes · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RE 10 Hannover – Goslar – Bad Harzburg RB 82 Göttingen – Kreiensen – Bad Harzburg RB 79 Bodenburg – Hildesheim RB 84 Paderborn – Ottbergen – Kreiensen RB 85 Paderborn – Ottbergen – Göttingen RB 86 Einbeck-Mitte – Einbeck-Salzderhelden – Göttingen
- Remarks
- Vehicles provided by the authority
No. 34
Elektronetz Nord Magdeburg
Gross with incentive · Negotiated procedure with prior call for competition
- Contract term
- 10.12.2028 — 12.12.2043
- Services
- RB + RE + S- Bahn · Electric · 8,30 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: retrofit
- Operator
- DB Regio (awarded)
- Lines
- S 1 Schönebeck – Magdeburg – Burg S 2 Magdeburg – Zielitz RE 20 Magdeburg – Stendal – Uelzen RB 30 Halle (Saale) – Köthen – Magdeburg – Stendal – Wittenberge RB 40 Braunschweig – Magdeburg (– Dessau-Roßlau)
- Remarks
- Awarded to DB Regio
No. 113
Dieselnetz Sachsen-Anhalt
Gross with incentive · Other / TBD
- Contract term
- 12.12.2032 — TBD
- Services
- Other · TBD · 12,20 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- RE 4 Halle (Saale) – Halberstadt – Goslar RE 10 Magdeburg – Sangerhausen – Erfurt RE 11 Magdeburg – Halbertsadt – Thale RE 21 Magdeburg – Halberstadt – Goslar RE 31 Magdeburg – Halberstadt – Blankenburg RE 24 Halle (Saale) – Halberstadt RB 33 Stendal – Tangermünde RB 35 Wolfsburg – Stendal RB 36/RE 6 Wolfsburg – Magdeburg RB 41 Magdeburg – Aschersleben RB 43 Magdeburg – Oschersleben RB 44 Aschersleben – Halberstadt RB 47 Halle (Saale) – Bernburg – Magdeburg RB 50 Aschersleben – Dessau RB 77 Naumburg – Wangen S 11 Halle (Saale) – Merseburg – Querfurt
- Remarks
- Decarbonisation of the diesel fleet envisaged. Vehicle provision (Diesel, BEMU, EMU) possible. Strong dependency on infrastructure development
No. 72
Emsland/Mittelland
Gross · Restricted procedure
- Contract term
- 15.12.2030 — 08.12.2040
- Services
- RE · Electric · 6,20 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: TBD
- Operator
- Not yet awarded / see authority
- Lines
- Teillos Emsland: RE 15 Münster – Emden Teillos Mittelland: RE 70 Braunschweig – Hannover – Bielefeld RE 60 Braunschweig – Hannover – Rheine RE 62 Rheine - Osanbrück - Löhne
- Remarks
- Second-hand vehicle type approval
Source: Bundesverband SchienenNahverkehr (BSN), Wettbewerbsfahrplan 2025. Data are as published in the Wettbewerbsfahrplan and have not been independently verified against the underlying tender documentation.
Further reading
Last reviewed: 18 April 2026.