Aufgabenträger · Mecklenburg-Vorpommern
Verkehrsgesellschaft Mecklenburg-Vorpommern mbH
- Abbreviation
- VMV
- Land / remit
- Mecklenburg-Vorpommern
- Legal form
- Landesgesellschaft (GmbH)
- Seat
- Schwerin
Graf-Schack-Allee 10A, 19053 Schwerin
- Website
- www.vmv-mbh.de
- Management
- Managing director(s) per the authority's Impressum. Names rotate; always check the current Impressum for the authoritative list.
Background
Verkehrsgesellschaft Mecklenburg-Vorpommern — Landesgesellschaft founded 1994, 100 % owned by the Land Mecklenburg-Vorpommern. Aufgabenträger for the whole Land; the regional fleet mix has moved increasingly toward PTA-side vehicle-pool models in recent awards.
Remit and mandate
Sole SPNV-Aufgabenträger for Mecklenburg-Vorpommern.
Tender pipeline — Wettbewerbsfahrplan 2025
The following lots are listed in the 2025 Wettbewerbsfahrplan (BSN) with this authority as the lead or as a participating authority. Leadership counts: 7 lot(s) as lead authority, 2 lot(s) as participating authority.
As lead authority
No. 30
Schmalspurbahn "Rasender Roland"
TBD · Open procedure
- Contract term
- 11.06.2028 — 08.12.2040
- Services
- RB · Steam · 0,14 M train-km/yr
- Rolling stock
- Pool: yes · New-build: no · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- Lauterbach Mole – Putbus – Göhren
- Remarks
- Vehicles provided by the authority
No. 23
Teilnetz Ostsee-Alster
Gross with incentive · Open procedure
- Contract term
- 12.12.2027 — 07.12.2041
- Services
- RE · Electric · 3,34 M train-km/yr
- Rolling stock
- Pool: no · New-build: yes · ETCS: retrofit
- Operator
- DB Regio (awarded)
- Lines
- Hamburg – Büchen – Rostock Schwerin – Lübeck (ab 2030) Rostock – Bad Kleinen – Lübeck (ab 2030)
- Remarks
- Awarded to DB Regio, zweite service phase Jfpl. 2030 mit 4,23 Mio. Zugkm/a vorbehaltlich Verfügbarkeit Infrastruktur
No. 27
Schmalspurbahn "Molli"
TBD · Other / TBD
- Contract term
- 12.12.2027 — 10.12.2039
- Services
- RB · Steam · 0,10 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- Bad Doberan – Kühlungsborn West
- Remarks
- steam
No. 28
Rügenlinie
TBD · Open procedure
- Contract term
- 12.12.2027 — 08.12.2040
- Services
- RB · TBD · 0,10 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- Bergen auf Rügen – Lauterbach Mole
No. 171
Teilnetz Usedom II
Gross with incentive · Open procedure
- Contract term
- 13.12.2037 — 13.12.2050
- Services
- RB · TBD · 1,50 M train-km/yr
- Rolling stock
- Pool: TBD · New-build: yes · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- (Swinoujscie Centrum –) Ahlbeck – Züssow Zinnowitz – Peenemünde potentially weitere
- Remarks
- Conversion to battery traction under review, Network perimeter potentially unter Einbeziehung Südanbindung Usedom (Karniner Brücke)
No. 70
Teilnetz BUECKER
Gross with incentive · Open procedure
- Contract term
- 15.12.2030 — 14.12.2043
- Services
- RB + RE · Battery · 2,50 M train-km/yr
- Rolling stock
- Pool: no · New-build: yes · ETCS: pre-equipped
- Operator
- Not yet awarded / see authority
- Lines
- Bützow – Pasewalk (– Szczecin) Pasewalk – Ueckermünde (possibly adjustments or further lines)
- Remarks
- Battery market consultation ongoing; alignment with integrated timetable planning; precise network scope TBD.
No. 87
Teilnetz Usedom Dieselauslauf
Net with capped risk · Negotiated procedure with prior call for competition
- Contract term
- 15.12.2030 — 12.12.2037
- Services
- RB · Diesel · 1,50 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: no
- Operator
- Not yet awarded / see authority
- Lines
- (Swinoujscie Centrum –) Ahlbeck – Züssow Zinnowitz – Peenemünde
- Remarks
- Begrenzte Fortführung Dieselbetrieb unvermeidbar, Infrastrukturanpassungen Vorausetzung für Tractionsumstellung
As participating authority
No. 137
Netz Elbe-Spree
Gross with incentive · Other / TBD
- Contract term
- 10.12.2034 — TBD
- Services
- RB + RE · Electric + Battery · 28,00 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: pre-equipped
- Operator
- Not yet awarded / see authority
- Lines
- Magdeburg – Berlin – Frankfurt (Oder) Nauen – Berlin – Cottbus Berlin – Cottbus Dessau – Berlin – Lübbenau – Senftenberg Wismar – Wittenberge – Berlin – Wünsdorf-Waldstadt – Elsterwerda / Finsterwalde Nauen – Berlin Oranienburg – Golm – Potsdam – Griebnitzsee Potsdam – Golm – Berlin Königs Wusterhausen – Flughafen BER – Golm – Potsdam – Griebnitzsee Golm – Potsdam – Berlin – Flughafen BER Eberswalde – Berlin – Flughafen BER – Wünsdorf-Waldstadt Oranienburg – Berlin – Ludwigsfelde Potsdam – Beelitz – Jüterbog Beelitz Stadt – Berlin-Wannsee Brandenburg – Rathenow Berlin – Flughafen BER
- Remarks
- possibly also fuel cell
No. 6
Netz Nord-Süd
Gross with incentive · Other / TBD
- Contract term
- 13.12.2026 — 11.12.2038
- Services
- RE · Electric · 11,60 M train-km/yr
- Rolling stock
- Pool: no · New-build: no · ETCS: pre-equipped
- Operator
- DB Regio (lots 1, 2 and 3)
- Lines
- RE3 Stralsand / Schwedt – Berlin – Lutherstadt Wittenberg RE4 Stendal – Rathenow – Berlin – Falkenberg (Elster) RE5 Rostock / Stralsand – Berlin – Ludwigsfelde
- Remarks
- Lots 1, 2 and 3 awarded to DB Regio
Source: Bundesverband SchienenNahverkehr (BSN), Wettbewerbsfahrplan 2025. Data are as published in the Wettbewerbsfahrplan and have not been independently verified against the underlying tender documentation.